Marriot Hotel
![Marriot Hotel](https://uploads-ssl.webflow.com/63000131d9a25df1d5a8c14e/63000131d9a25d06a9a8c1ff_1.jpg)
Project
Marriot Hotel
Owner
City of Flagstaff
EMC Role
Subcontractor
Engineer
WLB Engineering
Project Overview
Site development for the Marriot Hotel. The limestone soil conditions and the proximity to I-17 and I-40 required the site be profiled to accomplish the nearly 60,000 CY of excavation. Much of the resulting material was used for backfill and site fill areas. The Project consisted of:
- 60,000 CY of cut / fill
- Site Utilities
- Site Concrete
- 80,000 SF of asphalt